Valid for Sitecore
6.0.0
2.
Sitecore 5.3 to Sitecore 6 MailingList module upgrade.
Prev |
Note:
When converting a solution from Sitecore 5.3 to Sitecore 6, module upgrades should be performed on a working Sitecore 6 solution as a last step when all other conversion steps are done.
Upgrade Instructions.
-
Backup any module layouts, sublayouts or templates you have customized. Also backup the Mailing List settings item (/sitecore/system/Modules/MailingList).
-
Install the module package for Sitecore CMS 6.
-
Choose Overwrite for all assembly files (*.dll) if prompted.
-
Choose Overwrite for all the files in /sitecore modules/shell/MailingList folder if prompted.
-
If the layout of the letters was changed (genericmail.html and genericmail.xslt files), use the genericmail.html and genericmail.xslt files from Sitecore CMS 5.3 or just choose Skip if prompted for the files.
-
Choose “Merge » Merge” for items if prompted except for /sitecore/system/Modules/MailingList item. When the update installation is finished, copy the field values from your old Mailing List settings item to the new one.
-
If you changed some data in Mailing List masters, make sure the new Mailing List branch templates contain correct data.
-
Copy the layouts and sublayouts from Sitecore CMS 5.3 to the upgraded solution.
-
Reuse the Mailing List database from Sitecore CMS 5.3.X.
-
Perform a republishing and test the site.
Prev